BACK_TO_LOG
Productividad y OEE 05 may 2026

The 7 Wastes of Lean Manufacturing (2026 Examples)

Master the Toyota model. We explain the 7 wastes of Lean Manufacturing (Muda) and how Artificial Intelligence (IoT) is definitively eradicating them in 2026.

The 7 Wastes of Lean Manufacturing (2026 Examples)
RECURSO DESCARGABLE

Hassle-free automation?

Checklist: 10 Steps to Digitize Your Plant

Avoid costly implementation errors

100% Spam-Free

What are the 7 Wastes (Muda) in Lean Manufacturing? #

The Toyota Production System (TPS) revolutionized industry by classifying anything that does not add value to the customer as "Waste" or Muda. Today, the quest to eliminate these 7 wastes of lean manufacturing is the core of any successful operational strategy. However, in 2026, it is no longer enough to observe them visually or write them on whiteboards; we need Edge IoT technology and Artificial Intelligence to detect and suppress them in real time.

The Classic 7 Wastes and Examples of Digital Resolution

  1. Overproduction: Producing more parts than required "just in case" or before the customer orders them.
  2. Waiting: Operators waiting for materials, machines waiting for maintenance, or lines stopped due to a lack of supplies.
  3. Transport: Unnecessary movement of materials between warehouses that does not add value to the product.
  4. Overprocessing: Performing processes beyond the quality standard required by the customer or using high-precision machinery for rough cuts.
  5. Inventory: Accumulating excess raw material or finished goods, which hides cash flow problems and takes up physical space.
  6. Motion: Inefficient movements of workers searching for tools or spare parts.
  7. Defects (Quality Wastes): Manufacturing products that do not meet specifications and must be reprocessed or thrown away.
    2026 Example: iGromi Artificial Vision algorithms scan 100% of production on the conveyor belt, instantly ejecting the defective product and identifying the matrix machine failure.
RECURSO GRATUITO

Descargar Guía 7 Desperdicios (PDF)

Descarga nuestra guía de bolsillo con ejemplos prácticos para identificar y eliminar los 7 desperdicios (TIMWOOD) en tu planta.

The 8th Waste: Unutilized Talent #

With the rise of Industry 4.0, an eighth waste was added: underutilized human talent. Keeping an industrial engineer filling out Excel spreadsheets to calculate OEE is one of the greatest modern wastes. That talent should be focused on strategic analysis, while iGromi's IoT telemetry does the heavy lifting of data collection.

How to automate Lean Philosophy in your Plant #

Detecting the 7 lean wastes with the naked eye is increasingly difficult in high-speed manufacturing lines. The solution is to create a Digital Twin of your plant.

KEYWORDS:

#7 wastes#7 wastes of lean manufacturing#7 despilfarros#7 wastes examples#lean manufacturing in spanish#quality wastes#toyota production system
Víctor Ruz

Sobre el Autor

Head of Engineering & CEO

Víctor Ruz

Ingeniero Civil con +10 años en automatización industrial. Habla el idioma de los PLCs y los robots como lengua materna. Integra tecnologías OT con sistemas modernos y ha liderado la implementación de sistemas MES en más de 50 plantas en Latam.

¿Te resultó útil? Comparte con tu equipo

Ayúdanos a llegar a más ingenieros y gerentes de planta que puedan beneficiarse de este contenido.

ENGINEERING_BULLETIN

Stay Ahead of Industria 4.0

Join 5,000+ managers and experts. Get technical analysis, OEE guides and Edge architectures straight to your inbox. Cero spam.

FREE_DOWNLOAD

Guía Definitiva de Productividad

Aprende a medir OEE y detectar microparadas con nuestro PDF técnico y checklist interactivo.

¿Buscas una solución automatizada?