CMMS software
built for industrial plants.

Stop managing maintenance with spreadsheets. iGromi CMMS gives you work orders, asset tracking, spare parts inventory, and real-time KPIs — all from one maintenance management system.

0
changes to the PLC
read-only, no reprogramming
0.05 °C
temperature accuracy
checked against a reference
3 phases
measured separately
power and power factor
100 %
processed on site
the cloud is optional

The Problem

Your maintenance team
still runs on paper.

No work order traceability

Technicians get verbal instructions. Completed tasks vanish without records. Audits become nightmares. No history of what was done or when.

Reactive maintenance culture

You run to failure because there's no scheduling system. Critical assets break at the worst time. Planned maintenance doesn't exist.

Zero visibility on KPIs

MTBF, MTTR, OEE — you can't measure what you can't track. Spreadsheets are static. Decisions are based on gut feeling, not data.

The Solution

Digital maintenance management
that your team will actually use.

Smart work orders

Create, assign, and track work orders in seconds. Technicians receive notifications on mobile. Managers see real-time progress. Full digital traceability.

Asset lifecycle management

Every asset has a digital history: maintenance logs, spare parts used, cost tracking, warranty dates. Know when to repair and when to replace.

Preventive maintenance automation

Schedule recurring tasks by calendar, meter, or runtime. The system triggers work orders automatically. Nothing falls through the cracks.

What you get with iGromi CMMS

Reduce downtime with planned maintenance
Full work order lifecycle: creation to closure
Mobile access for technicians on the plant floor
Spare parts inventory with reorder alerts
Real-time MTBF, MTTR, and maintenance cost KPIs
iGromi Edge integration for condition-based triggers
Multi-site management from one dashboard
Role-based access for operators, supervisors, and managers
From the maintenance plan to the completed work order
  1. 1 · What your plant already has

    • Your asset inventory
    • The preventive plan that lives in Excel today
    • Machine signals, if you connect them
  2. 2 · The iGromi node on site

    • Schedules tasks by frequency
    • Notifies each person in charge
    • Adds actual running hours from the PLC
  3. 3 · What your team gets

    • Assigned work orders and their status
    • Plan compliance per area
    • History per asset
Preventive maintenance plans in the iGromi CMMS
Screenshot of the iGromi dashboard with demo data.

Stop managing maintenance
on spreadsheets.

Book a 30-minute demo and see how iGromi CMMS can digitize your entire maintenance operation — from work orders to spare parts.

Request a demo

How is this rolled out in a plant that is already running?

The same five questions come up in every meeting, whichever solution is on the table. The answers depend on how the system works, not on the module.

Do I have to replace my PLC or my SCADA?

No. The system connects to what is already installed and reads from it; it does not replace the control layer and does not write to it unless that is explicitly defined. If the PLC does not expose its parameters, the iGromi Bridge discovers them by trying combinations until it gets a response, and if the machine speaks no protocol at all it is read by a sensor on the electrical signal.

Does it work if the internet goes down?

Yes. Processing happens at the Edge, inside the plant, so capture, rules and inference keep running with the link down. What stops is remote access and outbound synchronisation, which resumes on its own when the connection returns.

Does my data leave the plant?

Not by default. Video and telemetry are processed on the customer's Edge device. What leaves, and where it goes, is defined when the system is configured. That is the same property that underpins compliance with Chile's Ley 21.719 and what makes this viable in mining and in food.

How long until the first data point?

It depends on how many machines there are and what they expose. A line with equipment that speaks Modbus is read in days; a line of silent machines needs sensors installed and panel shutdowns coordinated, and that is set by the plant's maintenance calendar, not by us. The usual sequence is assessment, pilot, expansion.

What happens to what we already measure by hand?

It runs alongside during commissioning. For the first weeks the manual record keeps going in parallel as a validation counterpart: it is how you find out whether the automatic figure beats the handwritten one, and the habit is dropped on its own once that is demonstrated.

Related solutions

See all solutions