MES vs SCADA

MES vs SCADA: two layers, one connected operation.

SCADA supervises and controls processes. MES coordinates execution, traceability, and work. The useful decision is not replacing one with the other, but defining how they share context.

Production– ×
OVERVIEW● RUNNING
JARS PER HOUR · LINE 2
09:00 · 22 min stop
LOGGED FROM THE APP
Stop at 09:00 · why?
Material shortageMechanical failureFormat changeoverQuality
Line
2
Minutes
22
Shift
A
The supplier's lids didn't arrive. Warehouse notified.
✓ Logged by Matías · approved by Carla 09:20
🏠👁️📦💧⚡🔧🛡️🌡️

Clarify responsibilities

Separate process control from production execution and work management.

Avoid brittle integrations

Connect events and data without forcing one layer to do another layer’s work.

Keep traceability

Relate plant signals to batch, order, operator, and outcome.

01

What SCADA is

Supervisory control and data acquisition: the system that shows process state, manages alarms and sends setpoints to PLCs. It lives at ISA-95 level 2 and works in seconds.

02

What MES is

The manufacturing execution system coordinates orders, materials, batches, quality, traceability and OEE. It lives at ISA-95 level 3, between control and ERP, and works in shifts and orders.

03

Five concrete differences

ISA-95 level (2 vs 3), time horizon (seconds vs shifts), user (control room operator vs production manager), data (process variables vs orders and batches) and question answered (what is happening now vs what we produced and how efficiently).

04

When you need each layer

Without SCADA there is no centralized process supervision. Without MES there is no automatic OEE, batch traceability or link between what was produced and what was planned. A plant with SCADA and Excel sheets has the first layer and lacks the second.

05

SCADA runs the process

It supervises variables, alarms and commands of the control layer. It is essential to operate, but it does not replace order coordination, traceability or procedures.

06

MES coordinates execution

It organizes what to produce, with which material, under which instruction and with which result. Its value appears when that execution is fed by reliable plant events.

07

Context is the bridge

iGromi relates OT sources and execution applications without turning every integration into an isolated project.

08

How they integrate

SCADA exposes variables over OPC UA or Modbus; a gateway publishes them into a unified namespace over MQTT; MES and analytics consume that single source. Control is not touched: it is read in parallel.

Related

Connect MES, SCADA, and industrial data

Start free with the app. Your team logs from the first shift.

  1. 1Create your company, free
  2. 2Pick your trade: maintenance, production or safety
  3. 3Add systems and machines when you want

No credit card. Your data stays yours.

PLANT · SHIFT A
Tasks
Luis · maintenance
OVERDUE
Sugar silo 1
No signal since 05:40
Sensor · supply
TODAY
M-204 vibration
4.1 mm/s, above normal
Detected by the sensor
PROPOSED
Check the capper
14 badly seated lids since 08:30
AcceptDismiss
HomeTasksChatMore