Industrial IoT
that doesn't depend on the cloud.

Connect every sensor, PLC, and machine in your plant to one platform — running locally on your edge infrastructure. No cloud subscriptions. No data leaks. Full control.

0
changes to the PLC
read-only, no reprogramming
S7 · Modbus
and EtherNet/IP
direct PLC reading
0.05 °C
temperature accuracy
checked against a reference
100 %
processed on site
the cloud is optional

Protocols

Every industrial protocol.
One platform.

MQTT broker

Native MQTT broker for sensor data. Publish/subscribe architecture. Connect thousands of sensors with minimal bandwidth.

Modbus & OPC-UA

Read registers from any PLC. Siemens, Rockwell, Mitsubishi, Omron. Passive read — never modifies your ladder logic.

REST & WebSocket APIs

Expose plant data as structured JSON. Connect to your ERP, MES, or custom dashboards. Real-time WebSocket streams.

Why edge-native matters

No cloud dependency — works offline
Data processed on the plant node
No data leaves the plant without your authorization
Reads the PLC without reprogramming it
Installs on an industrial PC or Linux server
Deployed with Docker
One platform for every plant signal
  1. 1 · What your plant already has

    • PLCs, drives and meters
    • Tanks, ovens and cold rooms
    • IP cameras
  2. 2 · The iGromi node on site

    • Connects the protocols in a single node
    • Keeps the history on site
    • Keeps working without internet
  3. 3 · What your team gets

    • Dashboards per area and machine
    • Per-variable alarms
    • Integration with your systems
iGromi dashboard with level, pressure and flow of three tanks
Screenshot of the iGromi dashboard with demo data.

Connect your plant
in under 24 hours.

We'll connect iGromi OS to your first machine and show you live data in 30 minutes. No commitment.

Book a diagnostic

How is this rolled out in a plant that is already running?

The same five questions come up in every meeting, whichever solution is on the table. The answers depend on how the system works, not on the module.

Do I have to replace my PLC or my SCADA?

No. The system connects to what is already installed and reads from it; it does not replace the control layer and does not write to it unless that is explicitly defined. If the PLC does not expose its parameters, the iGromi Bridge discovers them by trying combinations until it gets a response, and if the machine speaks no protocol at all it is read by a sensor on the electrical signal.

Does it work if the internet goes down?

Yes. Processing happens at the Edge, inside the plant, so capture, rules and inference keep running with the link down. What stops is remote access and outbound synchronisation, which resumes on its own when the connection returns.

Does my data leave the plant?

Not by default. Video and telemetry are processed on the customer's Edge device. What leaves, and where it goes, is defined when the system is configured. That is the same property that underpins compliance with Chile's Ley 21.719 and what makes this viable in mining and in food.

How long until the first data point?

It depends on how many machines there are and what they expose. A line with equipment that speaks Modbus is read in days; a line of silent machines needs sensors installed and panel shutdowns coordinated, and that is set by the plant's maintenance calendar, not by us. The usual sequence is assessment, pilot, expansion.

What happens to what we already measure by hand?

It runs alongside during commissioning. For the first weeks the manual record keeps going in parallel as a validation counterpart: it is how you find out whether the automatic figure beats the handwritten one, and the habit is dropped on its own once that is demonstrated.

Related solutions

See all solutions