Your plant.
Live. In 3D.
A digital twin that updates in real time — not a static model. See every machine, sensor, and production line as it operates. Built on your edge infrastructure. No cloud required.
What's in the digital twin
1 · What your plant already has
- Each machine’s PLC
- Sensors and energy meters
- Existing cameras
2 · The iGromi node on site
- Unifies signals into a plant model
- Keeps each asset’s state up to date
- Everything stored on site
3 · What your team gets
- The plant on screen, with live data
- History to compare shifts and lines
- A basis to assess your maturity level
See your plant
like never before.
We'll show you a live digital twin of your plant in 30 minutes — using your existing sensors and cameras.
Book a diagnosticHow is this rolled out in a plant that is already running?
The same five questions come up in every meeting, whichever solution is on the table. The answers depend on how the system works, not on the module.
Do I have to replace my PLC or my SCADA?
No. The system connects to what is already installed and reads from it; it does not replace the control layer and does not write to it unless that is explicitly defined. If the PLC does not expose its parameters, the iGromi Bridge discovers them by trying combinations until it gets a response, and if the machine speaks no protocol at all it is read by a sensor on the electrical signal.
Does it work if the internet goes down?
Yes. Processing happens at the Edge, inside the plant, so capture, rules and inference keep running with the link down. What stops is remote access and outbound synchronisation, which resumes on its own when the connection returns.
Does my data leave the plant?
Not by default. Video and telemetry are processed on the customer's Edge device. What leaves, and where it goes, is defined when the system is configured. That is the same property that underpins compliance with Chile's Ley 21.719 and what makes this viable in mining and in food.
How long until the first data point?
It depends on how many machines there are and what they expose. A line with equipment that speaks Modbus is read in days; a line of silent machines needs sensors installed and panel shutdowns coordinated, and that is set by the plant's maintenance calendar, not by us. The usual sequence is assessment, pilot, expansion.
What happens to what we already measure by hand?
It runs alongside during commissioning. For the first weeks the manual record keeps going in parallel as a validation counterpart: it is how you find out whether the automatic figure beats the handwritten one, and the habit is dropped on its own once that is demonstrated.
Related solutions
Industrial IoT platform
Connect sensors, gateways and actuators in a single data layer.
Production monitoring
Real-time production KPIs, downtime and line-speed visibility.
Industrial edge computing
On-site processing and operation without an internet connection.