What you will need
- An active iGromi OS account (emailed to you after purchase or early-access registration).
- At least one iGromi Bridge connected and linked to your account (see the Bridge installation article).
Step 1: First sign-in
- Go to your portal at
app.igromi.comand sign in with the credentials from the welcome email. - Change the temporary password on first use.
- Confirm the plant time zone — every OEE and shift calculation depends on it.
Step 2: Build the asset tree
- Go to Configuration > Assets.
- Create the hierarchy that mirrors your plant: Site > Area > Line > Machine.
- This structure is what later lets you aggregate KPIs by line or by area without reconfiguring anything.
Step 3: Link your first tag
- With at least one input configured (sensor, PLC or analyzer), go to Data Sources.
- Drag the detected tag onto the matching machine in the asset tree.
- Within seconds the live value should appear in that machine's widget on the Main Dashboard.
Step 4: Your first dashboard
- Go to Dashboards > New.
- Add a
Time Serieswidget and pick the tag you just linked. - Save — the dashboard is also available in the mobile app under the same account.
From here, the natural next step is configuring alerts (see the related article) so iGromi OS warns you before a problem turns into downtime.